• Our Work
  • News
  • About Us
    • Services
    • Practice
    • Our Team
  • Contact
  • Our Work
  • News
  • About Us
    • Services
    • Practice
    • Our Team
  • Contact
Go Back
Toft

All    Hotels & Conference     Education & Training     Interior Design     Commercial & Workplace     Community & Leisure     Healthcare     Historic & Conservation     Residential

  • All Sectors

All

Hotels & Conference

Education & Training

Interior Design

Commercial

Community & Leisure

Healthcare

Historic & Conservation

Residential

Designed to meet both the needs of the developer and the requirements of future tenants, the building is arranged to provide for long term flexibility. Overlaid onto this underlying principle, the building layout and aesthetic detailing were developed bespoke to the tenant’s requirements. The current layout consists of a feature entrance lobby and display area, three laboratory spaces, conference and meeting rooms along with a workshop and ancillary spaces.

Set in a planning-sensitive rural location, the project involved the development of a sketch scheme initially conceived by others and revisiting the project briefing stages to ensure that the client’s long-term requirements were met. This was followed by detailed design and construction phases closely co-ordinated with the client and their tenants to produce high quality contemporary internal accommodation with flexibility to meet future needs.

Related Projects:

BMW Group AcademyBMW Group Academy East End Foods DunedinDunedin

8 Euston Place, Leamington Spa, Warwickshire, CV32 4LN

01926 450391

admin@synergyarchitects.co.uk

  • Follow
  • Follow
  • Follow
© Copyright 2026 Synergy Architects. All Rights Reserved.

Privacy Notice  |  Cookie Policy  |  Terms & Conditions

Web Design by GHOST Leamington Spa